An autotransformer with a 220/110 kilovolt voltage and a force of 200 megavolts has been installed at the power plant.
Some 780 meters of 110-kilovolt power lines, stretching over the Kura River, have been laid. The lines have been connected to the new autotransformer.
The autotransformer is also equipped with a modern relay protection and automation.
Now, with the additional autotransformer it has become possible to carry out any repairs and ensure uninterrupted power supply.
Connecting the autotransformer has had a positive impact on the quality of the power supply to the city of Mingachevir and adjacent territories.
More about: Azerbaijan