Azerishig OJSC is laying a 35 kW power line near the village of Alagollyar in Kalbajar district, AzVision.az on November 11.
The laying of a 22-kilometer line is carried out to supply power to the No. military unit.
According to the information, two transformers with a capacity of 250 kVA have already been installed.
More about: