During the mentioned period, 58.2% of the total gas transportation was carried out through the Baku-Tbilisi-Erzurum (BTE) pipeline.
Consequently, just over 21.121 billion cubic meters of gas were transported through the BTE in 11 months, which is a 1.6% increase compared to the corresponding period of 2024.
AzVision.az
More about:






