`Azerbaijan able to elevate natural gas production to 40 bn cm per year`
Abdullayev noted that a total of $41 billion was invested in Azeri-Chirag-Guneshli (ACG) field blocks. "Five billion barrels of oil is planned to be produced from ACG by 2024. Moreover, by increasing the oil production coefficient, extra four billion barrels of oil will be extracted," he added.






