Minister of Health Ogtay Shiraliyev informed the head of state about the reconstruction work. It was noted that the hospital was built in 1987 and had not been overhauled ever since.
The hospital consists of three main blocks. The 430-bed facility has a delivery room, surgical and therapeutics departments. The hospital is supplied with state-of-the-art medical equipment. All conditions have been created in the wards for patients.
The head of state was told that all infrastructure of the hospital was improved.
President Ilham Aliyev also met with the hospital`s staff.
More about: